Extent and Medium of Descriptive Unit

16.5 x 21.5 cm silver gelatin dry plate glass negative

Dates of Creation

[ca.1903]

Scope and Content

Rebuilding a railway bridge over the Miramichi River above Newcastle on the line of the ICR. New span is being assembled at far right prior to being floated into position on special scows. A span of the old bridge is being dismantled for scrap metal at left.

Access Points